Ceramic fuses and fuse wire
If you are still rewiring a fuse with wire off a card, the board predates safety switches entirely.
Ceramic fuses and rewirable boards belong in the shed, not on the wall of a house with a family in it. We replace them with a compliant board, properly labelled, on the same day where we can.
Three fields. We come back with an upfront price for your switchboard upgrades.
Warning Signs
If more than one of these sounds like your place, the board is doing you no favours. None of them are urgent on their own. Together they usually mean the board is older than the wiring behind it.
If you are still rewiring a fuse with wire off a card, the board predates safety switches entirely.
Nuisance tripping is usually a board or a circuit telling you something, not a fault to be reset and ignored.
One RCD covering the whole house means a fault anywhere kills power everywhere, including the fridge and the alarm.
Every way used means the next air conditioner, EV charger or shed circuit cannot go in without a board change anyway.
Any browning around a fuse holder, a burning smell or a buzz from the board is a call now, not a call later.
If nobody can tell which switch does what, nobody can isolate safely in an emergency.
Before And After
A switchboard upgrade is not cosmetic. It changes what happens in the half second after something goes wrong behind a wall.
Before
After
Every board we install is tested circuit by circuit before we leave, and the results stay with the job. The sheet in this photo is from a three phase board we finished in Melbourne. That is the last step on every upgrade we do, single phase or three.
Scope
Correctly sized and sealed, with room to work in and room to grow.
Not to the appliance and not to whatever was there before. Every breaker matched to what it is actually protecting.
Safety switches fitted to the circuits the Wiring Rules require them on, and tested with an instrument rather than by pressing the button.
The part nobody sees and the part that decides whether the safety switches can do their job. Checked and brought up to standard as part of the upgrade.
Every circuit traced, tested and labelled, so the next person at the board knows what they are switching off.
Optional, and worth discussing if you have solar, a home office or a lot of electronics on the same supply.
Full test sheet and a Certificate of Electrical Safety for the prescribed work, handed to you before we leave.
How It Runs
A photo of the open board is often enough to quote from. If not we come out. Either way the quote is free and the price is upfront.
Most single phase upgrades are a same day job with the power off for part of it. We tell you roughly how long before the day, not on it.
Old board out, new board in, every circuit reconnected, identified and tested with an instrument.
Board labelled, test results recorded, Certificate of Electrical Safety issued, and two minutes showing you which switch does what.
Pricing
Every board is different, which is why we quote them individually rather than off a flat rate. These are the things that move it.
A two bedroom unit and a five bedroom house with ducted heating and cooling are not the same job.
Three phase boards carry more hardware and take longer to change over.
If the mains, the earth or the circuits coming into the board are not up to standard, that work is separate and we will show it separately.
Sometimes the meter box is the wrong size or the wrong position and the board has to be relocated or extended.
Surge protection, spare ways, an EV charger circuit or a separate garage or shed supply added at the same time.
Our Work
Photos from Bernard Electrics jobs around Melbourne. No stock imagery, just the work.



Questions
The clearest sign is ceramic fuses with fuse wire, which means the board has no safety switches at all. Frequent tripping, no spare ways, scorch marks or a buzzing sound, and unlabelled circuits are the others. Send us a photo of the open board and we will tell you honestly whether it needs doing.
Most single phase domestic upgrades are a same day job, with the power off for part of it. Three phase boards and jobs where the enclosure has to be moved take longer. We will give you the expected power off window before the day rather than on it.
Yes, for part of the day. We will tell you roughly how long when we book it in so you can plan around the fridge, a home office or anyone working from home.
The Wiring Rules require residual current protection on the circuits they apply to, and that scope has widened over the years. When we upgrade a board we fit RCD protection to the circuits that require it and test each one with an instrument before handover.
Yes. We do single phase and three phase domestic boards, and industrial switchboard installation and changeovers as well.
Yes. Every circuit is tested and a Certificate of Electrical Safety is issued for the prescribed electrical work. You keep it, and it matters at sale or insurance time.
It depends on the number of circuits, single or three phase, the condition of the existing mains and earth, and whether the enclosure has to move. Quotes are free and the price is upfront, with no hidden fees and no surprise call out charge.
Service Areas
Based in Doncaster East and working right across inner Melbourne, the bayside suburbs, the south east and the eastern suburbs.
Send a photo of the open board and we will tell you what it needs and what it costs, at no charge.
Contact
Phone, text, email or the form. Whatever is easiest. Urgent jobs are always best by phone.
Tell us what you need and we will come back with a free quote.